2.
Award of Professional Services: 2026 Water System Improvements
(Design and Inspection Services) to Fehr Graham, of Rockford, Illinois for
an estimated budget of $2,500,000.00 for 2026, $6,250,000.00 for 2027,
and $6,250,000.00 for 2028 (based on hourly rates). The contract duration
is through February 28, 2027 with two (2) possible one-year extension
options upon mutual consent of the City and the Consultant. The funding
sources are the Water Replacement Improvement Account (WRIA) and
State Revolving Fund (SRF).
3.
4.
Award of RFP: Water Main Capacity - Fire Hydrant Flow Testing and
Assessment (RFP No. 126-W-005) to M.E. Simpson Co., Inc., of
Valparaiso, Indiana in the estimated amount of $73,000.00 (based on unit
pricing). The contract duration is through December 31, 2026 with four (4)
annual extension options. The funding sources are the Fire and Water
Department Operating Budgets.
Award of Joint Purchase Contract: 2026 Light Duty City-Wide Vehicles to
Enterprise Fleet Management Inc., of Saint Louis, Missouri in the amount
of $117,729.00. The contract duration is 48 months for one (1) vehicle and
60 months for two (2) vehicles. The funding source is the Water Division
Capital Lease Budget.
5.
6.
7.
8.
9.
Award of Bid: Sidewalk and ADA Repairs Package #1 2026 (Bid No.
226-PW-025) to TCI Concrete, of Rockford, Illinois in the amount of
$112,894.75. The contract duration is through May 15, 2026. The funding
source is the 1% Infrastructure Sales Tax.
Award of Bid: City-Wide Pavement Preservation - Microsurfacing 2026
(Bid No. 126-PW-019) to AC Pavement Striping Co., of Elgin, Illinois in
the amount of $490,809.90. The contract duration is through October 2,
2026. The funding source is Motor Fuel Tax (MFT) Funds.
Award of Bid: City-Wide Pavement Rejuvenation 2026 (Bid No.
126-PW-018) to Corrective Asphalt Materials, LLC., of South Roxana,
Illinois in the amount of $342,026.96. The contract duration is through
July 31, 2026. The funding source is Motor Fuel Tax (MFT) Funds.
Award of Bid: City-Wide Bridge Preservation 2026 (Bid No.
126-PW-009) to M & M Concrete, of Stockton, Illinois in the amount of
$59,940.85. The contract duration is through July 31, 2026. The funding
source is Motor Fuel Tax (MFT) Funds.
Award of Design Engineering Agreement: Beverly Park Floodplain
Reconnection to HR Green, Inc., of McHenry, Illinois in the not-to-exceed
amount of $105,936.00. The contract duration is through July 2027. The
funding source is the CIP General Fund.